URETHANE CEMENT FLOORING PROJECT

Meat Processing Facility — Urethane Cement

Western U.S.

USDA-compliant urethane cement floor system installed throughout a meat processing facility — coved, drained, and built for daily caustic washdown.

PROJECT OVERVIEW

About this project

USDA-compliant urethane cement floor system installed throughout a meat processing facility — coved, drained, and built for daily caustic washdown.

Scope of work

  • 01Floor prep & shotblast
  • 02Urethane cement mortar
  • 03Integral cove base
  • 04Drain & trench detailing
PROJECT GALLERY

From the jobsite

Have a similar project?

Send us your scope or specs and we'll match the right system. Senior estimator, 1 business day.

START YOUR PROJECT
Steven Peckham at Peckham Coatings
Steven Peckham

Every project starts with a plan.

We're always happy to answer any of your questions. Tell us about your facility, your timeline, and your spec.

Start Your Project

Email or phone — at least one so we can reach you.

A senior estimator (not a salesperson) will respond within 1 business day.

Call UsGet in Touch